Western Sydney Green Gas
The Western Sydney Green Gas Project (WSGGP) involves the construction of a power to gas (P2G) hydrogen facility at the existing Horsley Park Trunk Receiving Station, located in Western Sydney. The facility will use renewable electricity to generate hydrogen, which can be injected into the natural gas network or used to generate electricity back to the grid by means of a hydrogen-powered micro-turbine and hydrogen fuel cell. Hydrogen generated in the facility will also be used to fill transportable hydrogen cylinders. Future provision has been made in the design for vehicle re-fuelling station. The plant will also generate waste-water which will be used for local irrigation
Scope of Services
It also included the minimum design, materials, manufacture, installation, inspection, testing, transportation, packaging, and documentation requirements for the electrical works for the Project |