SA Santos Moomba Switchroom 2 & 3 Motor Control Centre Replacement
July 2016
In a very competitive tendering environment ICE is proud to have secured another significant project with Santos in the Cooper Basin. As part of the continuous improvement culture at Santos the current Switchrooms 2 & 3 are to be replaced with a new Switchroom, Switchroom 9. This $2M+ project will be executed over a period of 8 months and require several shutdowns for the phased cutovers. This specific project will employ up to 10 ICE local South Australian electricians from our Whyalla and Adelaide branches.